top of page
Student Roost - The Boulevard 
(York) 

Air Brick Modification

Excavated a perimeter around the building where the air bricks are located. Cleaned out existing airbricks ensuring ventilation is possible and installed a powder coated trench perimeter guard to prevent future soil/gravel ingress.

MPB%2520Logo%2520-%252001_edited_edited.

Facilities Management

Since opening the doors to our business in 2020, MPB Facilities Management has been fully dedicated to client satisfaction. In all that we do, we strive to work meticulously with integrity in order to provide high-quality results in all our projects.

 

Please get in touch with us, we would love to speak with you about any of your project needs. Liverpool Based with a wide span around the country. 

Unit 20, Mersey House, The Matchworks
Speke Road
Liverpool
L19 2PH

Accreditations:

©2020 MPB Facilities Management. Site proudly created by Blue Stone West

bottom of page